01 / EARLY RESEARCH
Preliminary assessment
Initial desk-based screening within an agreed site boundary and research scope.
- Review of agreed available records
- Initial interpretation and recommendations
- Scope and limitations set out in the report
PRICING
Plan your budget with clear guide prices. Every quotation is tailored to your site, programme and the specialist support required.
Use these guide prices to plan your budget. Final pricing depends on the agreed site, activity and delivery requirements. All figures exclude VAT where applicable; VAT status, expenses and the complete payable amount will be confirmed in a written quotation.
01 / EARLY RESEARCH
Initial desk-based screening within an agreed site boundary and research scope.
02 / ON-SITE SUPPORT
Guide rate for a defined eight-hour weekday day shift.
03 / COMPLEX REQUIREMENTS
Detailed assessments, technical advice, specialist surveys, training and clearance contracts.
| Work type | Pricing model | What changes the cost |
|---|---|---|
| Desktop studies / UXO assessments | Fixed fee | Area, historical complexity, research depth and report scope |
| Consultancy / technical advice / watching briefs | Daily rate + agreed expenses | Role, work fronts, duration, shifts and location |
| Surveys / drone support / target investigation | Mobilisation + day rate + equipment rental | Method, terrain, access, coverage and required data outputs |
| Clearance / EOD / mine action | Fixed contract fee | Task, competence requirements, country, logistics and acceptance scope |
An illustration using the guide booking bands above. It excludes VAT, expenses, equipment and additional shifts. This is not a booking or quotation.
Confirm that the coverage, hours, number of engineers, equipment, reporting and expenses are equivalent. A headline day rate alone does not show the full project cost.
Travel, accommodation, mobilisation, specialist equipment, additional hours, out-of-hours work and other project-specific costs are not included unless a quotation expressly says so. VAT, where applicable, is additional.
No. Service delivery and pricing must be confirmed in writing first. The project brief tool helps you prepare the information needed for that conversation.
The budget planner applies one band to the entire number of booked days. Any actual contract must confirm the qualifying duration, cancellations, interrupted programmes and treatment of extensions.
YOUR NEXT STEP
Bring the boundary, the proposed works and your programme together in one clear project brief.
Site location. Works and depths. Existing reports. Timescales.
Prepare your project brief ↗