Battle area clearance (BAC) ↗
Specialist clearance work concerned with explosive contamination in a former battle area, conducted within a defined operational programme.
KNOWLEDGE / A–Z
A practical reference for developers, contractors and project teams. Explore 44 terms across research, construction, surveys, risk management and specialist mine action.
Specialist clearance work concerned with explosive contamination in a former battle area, conducted within a defined operational programme.
Historical records documenting aspects of wartime bombing and reported incidents. They can contribute to research into the history of a study area.
A drilled opening used for a defined investigation or installation purpose. Its location, depth and drilling method are important inputs to project planning.
A structured explanation of how a site’s conditions, possible hazards and planned activities relate to potential harm. It helps organise the assumptions behind a risk assessment.
A review of existing information carried out without a physical ground investigation. For UXO work, the sources may include historical mapping, military records, bombing information and previous reports.
A more developed investigation of the evidence relevant to potential UXO risk. It examines the site history and proposed activity in greater depth than an initial screening review.
The specialist discipline concerned with dealing with explosive ordnance. On commercial projects, the phrase may refer to a specific technical role, a support requirement or an agreed disposal task.
Education and communication intended to reduce people’s exposure to explosive ordnance hazards through safer behaviour.
A term used in post-conflict work for unexploded and abandoned explosive ordnance associated with conflict.
A response in survey data that differs from the expected background. It may justify interpretation or further investigation, depending on the survey’s objectives.
The collection of data about physical properties of the ground or objects within it using specialist sensing methods. The method must suit the question being investigated.
Work undertaken to understand ground conditions for a project. It may include intrusive investigation, sampling and testing, depending on the design questions being addressed.
Aerial images captured at an earlier date, used to investigate previous land use, development and visible changes across a site.
A distinct specialist discipline concerned with the disposal of improvised explosive devices.
An international framework of standards for mine action. Projects need to establish which standards and national requirements apply to their particular work.
A specialist investigation involving access into the ground to gather data relevant to a defined UXO objective, rather than relying solely on measurements from the surface.
Activities that enter or disturb the ground, such as trial pits, drilling, excavation and piling. Each activity has a footprint, method and depth that can influence the UXO assessment.
An evidence-based process for addressing suspected explosive contamination and determining the status of land within an authorised programme.
Light detection and ranging: a remote sensing technique used to measure distances and create spatial representations of surfaces and features.
Measurement of magnetic field variations. In a suitable survey context, these variations may help identify responses associated with certain buried objects or features.
A wider field of work addressing the humanitarian and developmental consequences of mines and other explosive ordnance. It extends beyond the physical removal of hazards.
The arrangements needed to bring people and equipment to a project and prepare for the agreed work. It can include travel, logistics, access and induction requirements.
Evidence-gathering and analysis about potential explosive contamination without technical ground investigation.
A foundation construction process involving structural elements installed into the ground. The design and installation method determine the area and depths affected.
An initial review that considers whether available evidence indicates a potential UXO concern for a defined site and proposed works.
The transfer of agreed reports, records and other outputs at the conclusion of a task or phase. It communicates what was delivered and any remaining limitations.
The planned arrangements used to provide confidence that specified project requirements will be met. QA considers how the work is organised and controlled.
Checks applied to particular outputs or results to establish whether they meet the specified requirements. QC complements wider quality management arrangements.
A common construction abbreviation for the documents that assess task risks and describe how the work is intended to be carried out.
The risk remaining after the selected measures have been applied. It reflects the limitations and assumptions that still matter to the project.
The planned arrangements for carrying out an activity while managing its risks. This includes people, procedures, equipment, responsibilities and communication.
The agreed description of what a supplier will deliver, where it applies, and the assumptions, boundaries and exclusions attached to the task.
The mapped extent of the land or works area being considered. It defines the spatial scope of research, assessment or contracted investigation.
A separately planned examination of a selected location or response identified through survey or other evidence. Its objective is to resolve a specific uncertainty.
The combination of relevant knowledge, skills and experience needed to carry out a defined task appropriately. Evidence should relate to the actual work being contracted.
Specialist oversight of agreed activities, with defined responsibilities and authority. The supervisor’s role should be clear to the client and delivery team.
Specialist field investigation used within mine action to develop evidence about suspected or confirmed contamination.
A short work-related briefing focused on a particular activity, risk or procedure. It supports communication with the people undertaking the task.
An excavation used to inspect ground conditions or expose relevant features during an investigation. Its planned location and depth help define the activity.
An understanding of relevant explosive hazards, the limits of an individual’s role and the reporting arrangements that apply to their work.
A contracted specialist activity to address explosive ordnance within a defined area and agreed parameters.
Measures selected to manage the UXO risk identified for a project. These can involve further research, changes to planning, specialist investigation, briefings or site support.
Specialist observation and technical support during agreed site activities, delivered within the coverage and responsibilities defined for the project.
Explosive ordnance that has been used or prepared for use but has not functioned as intended. In construction discussions, UXO commonly refers to potential buried ordnance from past bombing or military activity.
No terms match. Try a broader word or abbreviation.