THE RRS GLOSSARY
Why it matters to a project
For UXO scoping, a location plan without depths and methods is incomplete. Access, ground conditions and any proposed specialist equipment also need consideration.
PROJECT EXAMPLE
A revised borehole schedule is reviewed after the design team changes the investigation depth.
A useful distinction
A general site assessment should not be treated as a task-specific method for every drilling activity.
Questions to ask when it appears in a scope
- What area, activity and decision does this term refer to?
- What evidence or output will the project team receive?
- What limitations need to be carried into the next stage?